Characteristics
1. Easy operation, flexible starting accurate color register.
2. The meter counter can set printing quantity according to the requirement. Stop the machine automatically at the set quantity or when the material is cut off.
3. Lift and lower the printing plate cylinder manually, It will automatically stir the printing ink after lifting
4. The printing ink is spread by the knurled cylinder with even ink color.
5. Reliable drying system coordinated with high-speed rotation, it will automatically break circuit when the machine stops.
6. 360 continuous and adjustable longitudinal register device.
7. The imported frequency control of motor speed adapts to different printing speeds.
8. There are inching/Stopping buttons on the plate roller base and material rolling rack so as to make it easy operate the machine when the plate is installed.
Model of Machine |
YT-6600 |
YT-6800 |
YT-61000 |
Max. Width of Printing Material |
600mm |
800mm |
1000mm |
Max. Printing With |
560mm |
760mm |
960mm |
LengthRangeof Printed Product |
200-1000mm |
200-1000mm |
200-1000mm |
Max. Diameter of Roll Material |
φ 450mm |
φ 450mm |
φ 450mm |
Printing Speed |
5-70m/min |
5-70m/min |
5-70m/min |
Total Power |
10.87kw |
12.5kw |
14.37kw |
Weight of Machine |
3000kg |
3500kg |
4000kg |
1.Are You a Factory or Trading Company?
We are a factory, with 20 years experience on machines, our products sell very well all over the world.
2.What can the machine print on?
Our machine is multifunction, can do roll to roll printing, such as paper, plastic, woven,nonwoven and so on . Surely, you can send us your products, and we'll offer you the proper machine.
3.Can I get some samples? How can I get it ?
Yes, we can send you some free sample, but you are reponsable for delivery charages of TNT or DHL.
4.I need a quotation/how much is your price?
Please tell us your material,the width of your material,and how many color do you need? Then we will know which machine is suitable for you and suggest the right machine for you.
5.Waht's your delivery time?
Usually finish the production within 30 days after we confirm to receive the 30% advanced payment.Actually need to check according to our stock & production plan.